日韩欧美中文另类一区-亚洲欧美日韩另类丝袜一区二区-午夜福利资源激情视频-黑丝美女张开腿让男人桶

網(wǎng)站公告-NOTICE
航豐實業(yè)·產(chǎn)品分類
聯(lián)系我們
濟(jì)南航豐實業(yè)有限公司

電話:15168870138
聯(lián)系人:龐經(jīng)理

網(wǎng)址:http://www.sznewtr.com  

廠址: 德州市禹城市莒鎮(zhèn)產(chǎn)業(yè)園26棟

經(jīng)銷商地址:天橋區(qū)建華五金市場東區(qū)5-1  

魯ICP備09095923號-1

新聞資訊

當(dāng)前位置:首頁 / 新聞資訊

側(cè)壁式電纜橋架分支點的彎度

  (1)槽式大跨距電纜橋架由室外進(jìn)入建筑物內(nèi)時,橋架向外的坡度不得小于1/100。
  (1) when the slot type large span cable bridge enters the building outside the building, the overhead of the bridge shall not be less than 1/100.
  (2)電纜橋架與用電設(shè)備交越時,其間的凈距不小于0.5m。
  (2) when the cable bridge is crossed with the electric equipment, the net distance between the cable bridge and the electric equipment is not less than 0.5m.
  (3)兩組電纜橋架在同一高度平行敷設(shè)時,其間凈距不小于0.6m。(4)在平行圖上繪出橋架的路由,要注明橋架起點、終點、拐彎點、分支點及升降點的坐標(biāo)或定位尺寸、標(biāo)高,如能繪制橋架敷設(shè)軸側(cè)圖,則對材料統(tǒng)計將更精確。
  (3) the net distance between the two groups of cable bridges at the same height is not less than 0.6m. (4) draw the bridge's routing on parallel graph. We should specify the coordinates, location size and elevation of bridge's starting point, terminal point, turning point, branch point and lifting point. If we can draw the axle side diagram of the bridge, the material statistics will be more accurate.
  直線段:注明全長、橋架層數(shù)、標(biāo)高、型號及規(guī)格。拐彎點和分支點:注明所用轉(zhuǎn)彎接板的型號及規(guī)格。
  Straight line: full length, number of bridge frames, elevation, model and specification. Turning point and branch point: indicate the type and specification of the turning plate used.
  (5)確定方向:根據(jù)建筑平面布置圖,結(jié)合空調(diào)管線和電氣管線等設(shè)置情況、方便維修,以及電纜路由的疏密來確定電纜橋架的佳路由。在室內(nèi),盡可能沿建筑物的墻、柱、梁及樓板架設(shè),如許利用綜合管廊架設(shè)時,則應(yīng)在管道一側(cè)或上方平行架設(shè),并考慮引下線和分支線盡量避免交叉,如無其它管架借用,則需自設(shè)立(支)柱。
濟(jì)南電纜橋架
  (5) determine the direction: according to the layout plan of the building, combined with the settings of the air conditioning pipeline and electrical pipeline, convenient maintenance, and the density of the cable routing, we will determine the best routing of the cable bridge. In the indoor area, it is possible to erect walls, columns, beams and floors as far as possible, so that when the utility tunnel is erected, it should be erected parallel to one side or the top side of the pipeline. The crossing line and branch line should be considered as far as possible to avoid crossing. If there is no other pipe rack to borrow, it is necessary to set up a self supporting column.
  (6)荷載計算:計算電纜橋架主干線縱斷面上單位長度的電纜重量。
  (6) load calculation: calculate the cable weight per unit length on the longitudinal section of the main trunk line of the cable bridge.
  (7)確定橋架的寬度:根據(jù)布放電纜條數(shù)、電纜直徑及電纜的間距來確定電纜橋架的型號、規(guī)格, 托臂的長度,支 柱的長度、間距,橋架的寬度和層數(shù)。
  (7) to determine the width of the bridge cable laying: according to the number and diameter of the cable and cable spacing to determine the type and size of the cable tray, arm length, strut length, spacing, bridge width and number.
  (8)確定安裝方式:根據(jù)場所的設(shè)置條件確定橋架的固定方式,選擇懸吊式、直立式、側(cè)壁式或是混合式,連接件和緊固件一般是配套供應(yīng)的,此外,根據(jù)橋架結(jié)構(gòu)選折相應(yīng)的蓋板。
  (8) determine the way of installation: according to the setting conditions of the location, determine the fixed way of the bridge, choose suspended, vertical, side wall or mixed type, connecting piece and fastener are generally supplied, and select the corresponding cover according to the structure of the bridge.
  (9)繪出電纜橋架平、剖面圖,局部部位還應(yīng)繪出空間圖,開列材料表。
  (9) draw the flat, section map of the cable bridge, and the local part should draw the space map and list the material table.
  (10)電纜橋架內(nèi)纜線垂直敷設(shè)時,在纜線的上端和每間隔1.5米處應(yīng)固定在橋架的支架上,水平敷設(shè)時, 在纜線的首、尾、轉(zhuǎn)彎及每間隔3~5米處進(jìn)行固定。
  (10) when the cable is vertically laid in the cable bridge, it should be fixed on the support of the bridge on the top end of the cable and 1.5 meters away from each interval. When it is horizontally laid, it will be fixed at the beginning, the tail, the turning and the 3~5 meters away.
  公司始終堅持不斷進(jìn)行管理創(chuàng)新和科研創(chuàng)新,將以優(yōu)良的品質(zhì)、完善的售后服務(wù)贏得廣大客戶的信賴與支持,歡迎廣大新老客戶來我公司實地考察,洽談合作!
  The company always insists on continuous management innovation and research innovation, and will win the trust and support of our customers with excellent quality and perfect after-sales service. Welcome new and old customers to come to our company for field visits and discuss cooperation.
 
qq
售前咨詢熱線
15168870138
售后咨詢熱線
13465410318
日本精品久久不卡一区二区| 美女大鸡操很多水在线看| 久久无码免费视频| 欲色福利网免费在线播放 | 哈啊慢点不要了视频| 久久亚洲精品中文字幕一| 欧美一区二区三区久久国产精品| 草草久性色av综合av| 在线免费观看一区| 久久久久九九九国产精品| 国产精品亚洲一区二区三区极品 | 欧美亚洲熟妇视频在线观看| 精品免费在线观看等| 久久久久久久 亚洲精品| 免费看黑人操逼视频| 九九在线视频热线视频精选| 啊啊啊好爽高潮啦| 国产一区二区三区精品片| 中文有码无码人妻在线看| 男人把昆吧放女人屁股里| 校花内射国产麻豆欧美一区| 韩国无遮挡成人免费视频| 中国毛茸茸的操逼| 骚逼被狂插视频教程| 激烈18禁高潮视频免费| 亚洲一区二区三区精品日韩| 亚洲欧美日韩精品一区二区| 亚洲av午夜福利精品一区| 插逼爽歪歪视频免费| 美国女人抠插bbb| 骚狐狸免费在线观看视频 | av日韩在线观看一区二区三区| 中国老女人 操逼 视频| 女女同性女同1区二区三| 美女玩奶子和鸡巴| 日韩高清毛片在线观看| 国产天美传媒剧免费观看| 国产一二三四五自产| 久久综合色伊人九色91| 日本免费一区二区在线| 亚洲福利小视频在线观看|