日韩欧美中文另类一区-亚洲欧美日韩另类丝袜一区二区-午夜福利资源激情视频-黑丝美女张开腿让男人桶

網(wǎng)站公告-NOTICE
航豐實業(yè)·產(chǎn)品分類
聯(lián)系我們
濟南航豐實業(yè)有限公司

電話:15168870138
聯(lián)系人:龐經(jīng)理

網(wǎng)址:http://www.sznewtr.com  

廠址: 德州市禹城市莒鎮(zhèn)產(chǎn)業(yè)園26棟

經(jīng)銷商地址:天橋區(qū)建華五金市場東區(qū)5-1  

魯ICP備09095923號-1

新聞資訊

當前位置:首頁 / 新聞資訊

電纜橋架的施工需要根據(jù)要求進行!

電纜橋架是一種用于電纜敷設的支撐結(jié)構(gòu),它可以把電纜支撐起來并使它們保持在合適的位置。以下是山東電纜橋架的施工步驟:
Cable tray is a supporting structure for cable laying, which can support cables and keep them in proper position. The following are the construction steps of cable tray in Shandong:
1.確定電纜橋架敷設路線和支架位置:在進行電纜橋架的施工前,需要在設計圖紙上標注路線和支架位置,并現(xiàn)場清理橋架敷設路線,以確保敷設的順暢性和性。
1. Determine the laying route and support position of cable tray: before the construction of cable tray, it is necessary to mark the route and support position on the design drawing, and clean the cable bridge laying route on site to ensure the smoothness and safety of the laying.
2.安裝支架:根據(jù)支架圖紙和實際情況,安裝支架,支架應與地面垂直,支架底部應水平。在支架上方的地方安裝固定架等配套構(gòu)件。
2. Installation bracket: Install the bracket according to the bracket drawing and actual situation. The bracket should be perpendicular to the ground and the bottom of the bracket should be horizontal. Install supporting components such as fixing brackets above the bracket.
3.安裝橋架:根據(jù)設計圖紙及實際情況安裝橋架,橋架的長度、高度、寬度應符合設計要求。當安裝徹底時,應檢查橋架的平整度、牢固度及其他關(guān)鍵要素。
3. Installation of bridge: Install the bridge according to the design drawings and actual situation. The length, height, and width of the bridge should meet the design requirements. When the installation is complete, the flatness, firmness, and other key elements of the bridge should be checked.
山東電纜橋架
4.固定電纜:電纜橋架安裝完畢后,將電纜固定在橋架上,根據(jù)設計圖紙的要求進行排列,采用扎帶或其他材料進行固定,固定后測試電纜是否松動或滑動。
4. Fixed cable: after the installation of cable tray, fix the cable on the bridge, arrange it according to the requirements of the design drawing, fix it with ties or other materials, and test whether the cable is loose or sliding after fixing.
5.維護保養(yǎng):經(jīng)過幾個月的使用后,需要對電纜橋架進行檢查和維護,鐵銹和其他雜質(zhì),并檢查電纜和固定材料是否處于理想的狀態(tài),如有問題要及時處理。
5. Maintenance: After several months of use, it is necessary to check and maintain the cable tray, remove rust and other impurities, and check whether the cable and fixing materials are in an ideal state. If there is any problem, it should be handled in a timely manner.
總之,電纜橋架的施工需要根據(jù)設計要求進行,操作者需要有一定的施工經(jīng)驗,必須嚴格按照操作規(guī)程進行,以確保施工質(zhì)量和性。如果大家需要該產(chǎn)品可以聯(lián)系我們公司http://www.sznewtr.com
In a word, the construction of cable tray shall be carried out according to the design requirements. The operator shall have certain construction experience and must strictly follow the operating procedures to ensure the construction quality and safety. If you need this product, you can contact our company http://www.sznewtr.com 。
 
qq
售前咨詢熱線
15168870138
售后咨詢熱線
13465410318
可以免费看污污片的软件| 藏经阁91福利私人试看| 久久亚洲精品无码AV宋| 亚洲精品成人无码app| 久久国产精品二卡| 九九视频这里只有精品| 欧美日韩久久一区二区三区| 日韩欧美一区二三区风间由美| 97超视频免费在线观看| 国产乱子伦视频一区二区三区| 69国产精品久久久久久人| 丁香婷婷色婷婷粗大| 在线免费观看一区二区三区| 阴茎大头插少妇蜜穴视频| 制服丝袜国产在线第一页| 玩弄邻居少妇呻吟11p| 97超级免费视频在线观看| 精品一区二区视频在线观看| 美女裸胸屁股视频| 欧美精品视频在线| 美女操逼视频app| 国产欧美日本韩国一区二区| 极品 操 抽插视频| 日韩在线中文字幕在线视频| 亚洲欧美一区二区三区在| 国产精品操大屁股老淑女| 日本六十五十熟女一级黄色| 黑人大屌爆操骚货| 午夜性刺激在线视频免费| 爆操大奶骚货视频| 日本精品久久人妻一区二区三区| 熟妇人妻无乱码中文字幕| 大鸡巴操饿罗斯女人 | 99久久九九爱精品国产| 男的鸡巴插女的视频| 市长含着秘书的奶头| 好舒服好大好粗视频| 上萬網友分享a级国产乱| 爽妇网国产精品24| 午夜福利在线观看aaa| 亚洲国产无线码在线|